See How We Optimize IBM Power & AIX for Maximum Performance and Efficiency

Tuning turns your Power system into a beast. See how we’ve crushed slowdowns and cut costs for Major Banks and IBM Partners.

Cutting Batch Job Overruns by 40% After a Power10 Upgrade

🏦 Client: Leading South African Bank

🔍 Problem:

After migrating to Power10, batch jobs were overrunning by 40%, causing costly SLA fines and executive frustration.

⚙ Root Cause:

PowerVM tuning not optimized for Power10 — LPARs were misconfigured, causing latency on the hypervisor level.

Solution:

  • Adjusted LPAR CPU allocation to eliminate hypervisor bloat.
  • Tuned PowerVM settings for higher core efficiency.
  • Adjusted network and I/O configurations for faster processing.

 

🔥 Results:

Batch jobs 40% faster.  

Core utilization hit 85% (up from 50%), boosting software license ROI.

Zero SLA violations post – fix.

Team off the hot seat — finally.

🎯 Key Takeaway:

Even a Power10 upgrade won’t fix performance issues without proper tuning.

Fixing Power10 Migration Slowdowns for a Major Car Finance Company

🚘 Client: $750M Car Finance Company

🔍 Problem:

Power10 migration caused performance to drop instead of improve, delaying critical workflows and racking up $10K/week in overtime.

⚙ Root Cause:

LPAR settings didn’t match their workload profile for Power10 — CPU wasn’t optimized, causing inefficiencies.

✅ Solution:

  • Analyzed CPU and memory allocations to identify inefficiencies.
  • Adapted the LPAR layout for Power10 to match their workload profile.
  • Optimized I/O & network performance to reduce processing delays.

🔥 Results:

Processing 63% faster. 

Batch jobs steady – sales contracts on time.

Cut Oracle Database licensing costs by 53% – saving $800K and $170K/year in support.

🎯 Key Takeaway:

Upgrading to Power10 alone won’t deliver peak performance or cost savings — optimization is critical. By fine-tuning LPAR configurations, Trinity1 achieves up to 64% performance boosts and cuts Oracle Database licensing costs by 53%, saving our clients millions.

Helping an IBM Business Partner Close a $2.7M Storage Bid

🤝 Client: IBM Business Partner

🔍 Problem:

Their $2.7M storage bid was on the ropes — PowerVM bottlenecks threatened to tank it.

⚙ Root Cause:

The client’s PowerVM & LPAR settings were outdated, leading to underutilized resources and poor efficiency, choking I/O to their storage arrays.

✅ Solution:

  • Tuned it to smash their old runtime record.
  • Conducted a full PowerVM performance audit to identify bottlenecks.
  • Provided a step-by-step tuning & optimization strategy.

🔥 Results:

Sealed a $2.7M storage deal.

Batch times 30% faster.

Partner’s cred through the roof.

🎯 Key Takeaway:

IBM Partners can win bigger deals by bringing in specialized PowerVM expertise.

READY TO FIX YOUR IBM POWER SYSTEM?

⏳ Every week of slow performance costs you licensing fees, wasted CPU cycles, and SLA risks. Let’s fix it—before it drains more resources.